Demand curves measured from 63,260 orders · Jan 2023 – Aug 2026 (bundles counted into their component games) · stock snapshot: ATUM 10/08/2026 · click a row for the full picture
Orders to place
Supply options & simulator
China → Israel by sea (~3 months)
Urgent air, incl. production
DHL <500 kg · Tevel >500 kg
"What if I only order in X days?"
Built into last_day_to_restock
Coverage after arrival
160-card boxed games
Extensions & scratch cards
+ VAT (reclaimable)
Order drafts — every ORDER NOW product, sea/air already split
−15 = boat lands with 15 days of stock still left (buffer) · +10 = accept 10 stockout days to save air ₪
Piggyback products on the same shipment
Product
Stock
Sales 14d
/d now · peak
Runs out
last_day_to_restock
Status
last_day_to_restock = the last date you can place a sea order and still receive it before stock (plus safety buffer) runs dry, walking each product through its measured monthly demand curve. Passed → ORDER NOW with the date it passed. No meaningful sales → ∞. Sea quantities are always rounded up to full 1,000s (production runs). Air is the minimum: the exact units needed to survive until the boat lands (+10% cushion, rounded to 50), with weight and ₪ cost shown — under 500 kg go DHL, above that Tevel. Products younger than one year have partly estimated curves. Edits save automatically on this device.